Calculator
At what price should your plant stop?
Enter the fees you pay for every MWh you produce. The calculator tells you the price below which to stop, and what that would have saved over the last 12 months on actual IBEX prices.
Actual IBEX prices · 1 September 2025 – 31 August 2026
Stop price
€/MWh
Below this price every MWh you produce loses money – the plant stops. Above it, it earns.
- below this price
- 431 h
- saved
- €1,328
IBEX, 09.2025–08.2026 · estimate
Methodology
How we calculate
All inputs are public and there is a single formula, so you can check it yourself.
-
Stop price
We add up the fees you pay for every MWh you produce – grid access, balancing and your trader’s fee – and subtract your premium, if you have one. Below that price every MWh loses money.
-
Prices
We take the IBEX day-ahead price for every hour in the period 1 September 2025 – 31 August 2026.
-
Output
For every hour we estimate your plant’s output: your capacity (kWp) × the typical yield of 1 kWp for that month and hour, from PVGIS.
-
Savings
Every hour priced below your stop price counts as curtailed. For each: energy × (stop price − price). Summed by month and for the whole period.
The formula
- stop price
- = grid access + balancing + trader fee − premium, in €/MWh
- savings
- = Σ E × (stop price − price), over hours with price < stop price
- E
- = capacity (kWp) × yield of 1 kWp for that month and hour ÷ 1,000, in MWh
In TokPirate you can set a higher price if you want to stop earlier – but then you give up revenue in hours where the price still covers your fees.
Data
Sources and limitations
Sources
- Prices
- IBEX (Independent Bulgarian Energy Exchange) day-ahead market, Bulgarian bidding zone – 8,758 hourly prices for the period 1 September 2025 – 31 August 2026. Data from the ENTSO-E Transparency Platform, as compiled by Ember – European Wholesale Electricity Price Data (licensed CC BY 4.0).
- In this period
- 169 hours with a negative price. The lowest price was −€79.49/MWh (26 April 2026, 14:00–15:00 Sofia time).
- Solar output
- PVGIS 5.3 by the European Commission’s Joint Research Centre, PVGIS-SARAH3 database, averaged over 2005–2023. A 1 kWp system, fixed mounting at the optimal 36° tilt, 14% system losses, 42.2° N, 24.7° E (Plovdiv area) – about 1,363 kWh per kWp a year.
- Grid access fee
- €2.72/MWh excl. VAT from 1 July 2026 on all energy produced – the same for every solar plant, whether connected at low, medium or high voltage and whichever grid it is on (EWRC (КЕВР) Decision Ц-13, item 1.3). Plants on a distribution grid pay it to their grid operator, which passes it on to ESO. The voltage-specific transmission and access prices in the same decision apply to electricity customers draw from the grid, not to what plants produce.
- Last updated
- Data downloaded on 25 September 2026.
What we leave out
-
15-minute prices. Since 1 October 2025 IBEX has cleared in 15-minute intervals; here we use the average price of each hour. Short negative intervals inside an otherwise positive hour are averaged away, so the real effect of curtailing every 15 minutes can be larger.
-
Actual weather. Output is the typical yield for the month and hour, not the actual yield on a given day. On a cloudy negative-price day the loss is smaller, on a clear one it is larger.
-
Your contracts. We assume you receive the IBEX price plus your premium (if you entered one) minus your fees for every MWh. Fixed-price contracts, imbalance costs and schedule deviations are not included.
-
Own consumption. When the plant buys power from the grid (at night, for its own needs) it pays transmission and access fees that depend on the voltage level and the grid operator. They do not depend on how much it produces, so they are not part of the stop price.
-
Your plant. Location, tilt, orientation, shading and losses of your plant all change its output.
-
Curtailment. We assume the plant stops completely for the whole hour and restarts right after it.
An estimate. The result is an estimate based on historical prices and a typical yield profile – not a forecast, an offer or a guarantee of savings. Future prices and your contracts may produce a different result.
Stop losing money on the next negative price.