Growatt inverters
Growatt ShineServer: automatic curtailment on IBEX prices
With Growatt, owners follow their plant in the ShineServer web platform and the ShinePhone app, while installers work in a separate platform called OSS. TokPirate connects to your plant and decides for every 15-minute interval whether the inverters should run at full power or be curtailed – based on the IBEX price and your minimum.
No card · No hardware · Cancel anytime
Growatt at a glance
- Cloud
- ShineServer
- Web platform
- ShineServer
- App
- ShinePhone
- Account types
- owners (ShineServer, ShinePhone), installers and distributors (OSS)
- No extra hardware
- Set up in minutes
- Support in English and Bulgarian
01Automation
What TokPirate does with your Growatt plant
- 01
Curtails below your minimum price
For every 15-minute IBEX interval we compare the price with your threshold. When it’s lower, we limit your Growatt inverters through ShineServer – smoothly, without a hard shutdown.
- 02
Restarts automatically
As soon as the price is back above your threshold, production resumes. No need to log in to ShineServer and do it by hand.
- 03
Schedules for your trader
Planned curtailments go into the day-ahead schedule we send to your trader automatically. Less imbalance, no manual e-mails.
- 04
Profit after fees
Every 5 minutes you see the plant’s real revenue – after balancing, grid access and admin fees.
- 05
Real-time alerts
Push and e-mail alerts on lost connection, inverter faults or voltage deviations.
-
A sample day
Sample dataPrice below your threshold from 11:15 to 14:30 → the plant is curtailed for 13 fifteen-minute intervals, then runs again.
02Requirements
What you need to connect Growatt
ShineServer and ShinePhone are the web and mobile versions for owners, so access is usually granted from there. The account you use needs rights to change inverter settings. If an installer looks after the plant through OSS, we’ll work out with them where access is best granted from.
- Your Growatt inverters registered in ShineServer and sending data
- Access to the plant in ShineServer with control rights – view-only isn’t enough
- A working internet connection at the plant
- The minimum price below which you don’t want to sell
- Your trader’s contact details, if you want schedules sent straight to them
Not needed: new hardware, a site visit or replacing your inverters.
03Connecting
How connecting ShineServer works
Three steps, no site visit.
-
Start the free trial
Sign up for 14 days free, no card required, and tell us your plant runs on Growatt.
-
Grant access in ShineServer
Follow the short instructions for ShineServer. If the account belongs to your installer, we’ll help you sort it out with them.
-
Check and go live
We confirm the inverters are visible and accept commands, you set your minimum price, and the automation takes over.
My installer works in OSS. Do they need to be involved?
I have plants with Growatt and another brand. Can I manage them together?
Is curtailment safe for my Growatt inverters?
How much does TokPirate cost for a plant with Growatt inverters?
Other supported inverters
All inverters- Huawei FusionSolar
- Sungrow iSolarCloud
- GoodWe SEMS Portal
- SMA Sunny Portal
- Fronius Solar.web
- SolisCloud
- Deye Cloud
Growatt and ShineServer are trademarks of their respective owners and are mentioned only to indicate compatibility.
Stop paying to produce.
Connect ShineServer in a few minutes. 14 days free, no card required.